Learjet 85 Jet Gets Its Wings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Nov 21, 2012

Learjet 85 Jet Gets Its Wings

First Complete Wing Set Arrives In Wichita

The first wing shipment for Bombardier's Learjet 85 jet has arrived at the Wichita assembly line and is now in the process of being readied for mating to the fuselage of Flight Test Vehicle one (FTV1). Alongside the arrival of the first complete Learjet 85 aircraft wing, the fuselage for FTV2 has successfully completed its integrity inspection. Installation of the nose, bulkheads, floor, windshield and door surrounds are scheduled to begin in the coming days. Once complete the main fuselage will be shipped with the aft fuselage to the final assembly line.

Wings for the complete aircraft static test article are expected to arrive from Querétaro by the end of November as preparations for static ground testing continues. Elsewhere, the program is soaring along as all system supplier safety of flight test rigs been commissioned.
 
“Seeing the wings arrive for our first Learjet 85 test aircraft is a wonderful moment. A moment that could not have happened without the hard work and dedication of every single person involved in this project,” said Ralph Acs, Vice President and General Manager, Learjet. “This development program is gaining ever more momentum as we tirelessly work towards first flight and the first customer delivery.”

(Image provided by Bombardier)

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC